Latest News From Terra Resources
Below you will find up-to-date news from the Terra Resources team along with articles of interest
Kambale Graphite RC Drilling Program Completed
Most of the RC drill hole locations were guided by a recently completed ground HLEM geophysical survey that identified numerous conductive plates many of which correlate well with known areas of graphitic schist but with several having no drill holes nearby.
read moreNew EM Anomalies at Great Southern Graphite Project
An orientation ground EM survey over selected areas at Great Southern Graphite Project’s Kendenup and Martagallup licences has identified eight high-priority anomalies for follow-up investigation and improved understanding of the controls on mineralisation.
read moreHighly Prospective Uranium Targets Identified at Cluff Lake Project Near Historical Uranium Mine
Seven high-priority targets have been identified based on historical data and geophysical interpretation. The targets are based on a thorough review of historical exploration data which has been integrated with a detailed geological interpretation of all publicly available geophysical data completed by Valor’s consultant geophysics team, Terra Resources.
read more3D-IP Highlights Extensive Sulphide Zones at Mulga Bill
Offset pole-dipole induced polarisation (3D-IP) survey has identified large chargeable zones that are interpreted to be disseminated sulphide bodies beneath the central 3km strike of Mulga Bill. These zones correlate very closely with the gravity anomaly identified by GBR’s survey last year. Importantly, the previously-recognised correlation between gold and sulphur in GBR’s assay data suggests sulphide zones are an important target for gold mineralisation.
read moreKambale Graphite EM Survey Increases Size Expectations
The horizontal loop ground electromagnetic survey (HLEM) was undertaken in March 2022 by SAGAX Afrique SA with oversight, data processing and interpretation undertaken by Perth based Terra Resources Pty Ltd.
read moreSeismic Data Modelling Lights Up Mawson
Terra Resources principal consultant Mr Barry Bourne said “A detailed geological and geophysical review lead to the concept of seismic to further advance exploration at Mawson. Forward planning and modelling coupled with conventional seismic acquisition and advanced processing techniques has resulted in a world class outcome as evidenced by the detail in this annoucement.”
read moreInitial IP Results Highlight Mulga Bill Sulphide Zones
The IP survey was completed on four east-west lines, of which three cover the strike extent of known high-grade gold mineralisation within the central Mulga Bill area and one covers the southern end, where a recent AC hole intersected bottom-of-hole mineralisation assaying 23.78g/t Au.
read more3D Seismic Survey Underway at Mawson
HiSeis has been engaged by Legend to conduct a 3D seismic survey at the Mawson Prospect within the Rockford Project, Fraser Range, WA with Mr. Barry Bourne from Terra Resources as consultant. The data collection phase of the survey will be carried out on site over the coming weeks with the final processed results expected at the end of February 2022.
read moreMulga Bill: High Grades Continue as Geophysics Upgrades Size Potential
Geophysical consultants Terra Resources have reprocessed the Company’s Side Well VTEM data and interpreted it in parallel with the recently-completed high-resolution gravity survey. By using the VTEM data to remove the overburden effect from the gravity data a much clearer image shows a high-gravity trend corresponding to the Mulga Bill corridor.
read moreLYCEUM 2021
Barry Bourne was part of the Lyceum 2021 panel discussion on using geology to better refine geophysical models (and vice versa) to build more informed subsurface interpretations.
read moreGeophysics Prioritises Targets at Earaheedy
A review of available government and open-file geophysical datasets in combination with other geological data has delineated several high-priority targets for base metals on its Withnell and Terra Rossa projects in the Earaheedy Basin of Western Australia.
read moreMultiple New Structures Identified from High-resolution Magnetics as Drilling Ramps Up with Five Active Rigs
Phase One of the high-resolution heli-mag program has been completed, covering 40 kilometres of strike along the central part of Project. Preliminary analysis has identified multiple new structures that are being prioritised for drilling.
read more