A 19.2km Magnetotelluric Survey (MT) completed across 5 traverses, with three traverses across Target 2 implying a 3.6km2 sedimentary basin (highly conductive <3 ohm.m) on the 100% owned Scotty Lithium Project.
Read the full announcement here.
A 19.2km Magnetotelluric Survey (MT) completed across 5 traverses, with three traverses across Target 2 implying a 3.6km2 sedimentary basin (highly conductive <3 ohm.m) on the 100% owned Scotty Lithium Project.
Read the full announcement here.